Moving in at Meridian – Part 5

You’ve heard me talk about it over the last few blog posts, so here are some snapshots taken on October 3, right before leaving for the weekend of seminars, meetings and workshops with Marilyn Sholin at her ASTA Workshop. Of course, since then, things have progressed along nicely, but keeping with the actual timeline of progress, those pics will come later.

Front DoorInside DoorInside Door
Lobby from DoorDeskDesk with Cabinets
Lobby SeatingSidetableLobby Seating No Loght
Classroom Wall & Assembled CabinetsBookshelfLaptop Workstations

At this point in time, some of the furniture was in place, the cabinets were assembled, but only partially hung and the dividing gallery wall was nothing more than a drawing, some cable curled inside a flower urn and some masking tape on the floor. It is fun to look back at some of the beginning stages of this process.

Since it is blurry above, here’s the design on both doors – can’t leave any details out:SC_meridian_doors-AI13

The Grand Opening

Coincidentally, the Grand Opening of Meridian was also on October 3. While I would have loved to have been there, as mentioned above, I had to be in Asheville, NC to attend a couple of workshops and teach the Blogging with WordPress for Creative Professionals workshop (the next one is in planning) – details on the workshops coming up!

For a short article on the Grand Opening and Ribbon Cutting Ceremony, check out Greenwood Today.